Search scope:
排序: Display mode:
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 1, Pages 87-92 doi: 10.1007/s11709-008-0005-y
Keywords: practical new-type installation consistent Gymnasium
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 70-76
The installation technology of counterweight system of Three Gorges ProjectThe overall installation procedure of counterweight system has been put forward which are suitable forThen the construction processes and construction methods of balance chain guide installation, balancingpulley installation, main hoist rope installation and counterweight installation have been describedAt the same time, the installation technology system of counterweight system is set up.
Keywords: Three Gorges Project ship lift counterweight system installation procedure installation technology
Xianming SHI
Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 1, Pages 1-11 doi: 10.1007/s11709-016-0312-7
Keywords: arc sprayed Zn anode replacement reinforced concrete bridge preservation neural networks surface profile
C. RENNO, A. PERONE
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 384-395 doi: 10.1007/s11708-020-0717-9
Keywords: CPV system point-focus experimental model energy and economic analysis
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 77-82
The installation and demolition of Bailey truss support system of Threeof the narrow construction site, high construction strength, and big construction disturbance, the installationThe installation and demolition technology system of bailey truss support system has been establishedThis technology system ensures the smooth implementation of the installation and demolition of bailey
Keywords: ship lift Bailey truss installation demolition Three Gorges Project
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 53-59
The installation methods used in offshore wind farm around the worldwere summarized, and the process of split installation, the set necessity and principles of assemblyAn installation method was proposed by sitting of the diving boat.The diving installation ship was made by installing a crane, and was located in the seabed during theThe installation method is suitable for offshore wind farm construction.
Keywords: offshore wind farm method of assembled on shore method of split installation application
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 91-96
According to technology requirements of installation precision and characteristicsmethod and installation accuracy control elements have been in detailed analysis, put forward the suitablerack, nut column installation construction process and control measures for Three Gorges Project shipIn engineering practice, use the test of datum point to control installation precision of the rack andThus various high precision standard technical difficulties of installation of the rack, nut column,
Keywords: Three Gorges Project ship lift rack nut column installation of control precision control
Wei Shuman,Zhang Weiming and Li Chenzhi
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 87-90
Keywords: ship lift metal structure embedded parts high precision installation technology Three Gorges Project
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 529-538 doi: 10.1007/s11708-019-0624-0
Keywords: system power equipment electric generating unit power station auxiliary transmission and distribution installation
Research on the special lifting device for steel box girders of Sutong Bridge
Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 65-70
Sutong Bridge is a cable stayed bridge with a steel box girder and a main span of 1 088 m. The steel box girder of main-span includes five portions: back span large unit, large block of pylon, standard girder, back span closure girder and middle span closure girder. Each back span large unit was fabricated by welding several deck segments together in factory, and was erected by floating crane. Due to the high of navigational clearance of the main bridge, the traditional truss lifting device couldn't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight. Hence, a kind of lighter lifting device for the erection of back span large units was accepted for this bridge. In this paper, the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method. Because the bridge's navigation clearance is high, and the girder segment is wide and heavy, the meteorology and hydrology condition of the bridge district is abominable, and the requirements of long cable girder side pull-in, structure and performance propose high request to the lifting gantry. In this paper, key points of designing and using long cable pull-in angle adjustment device integrate into lifting gantry are introduced.
Keywords: Sutong Bridge large units lifting device cantilever installation lifting gantry design and use
Construction technology of well shaft tower construction engineering
Yang Yiming,Huang Jiapin,Shen Xihua,Cao Yueqin and Ma Zhimin
Strategic Study of CAE 2012, Volume 14, Issue 2, Pages 85-89
Keywords: parallel operations well tower sliding shaft equipment elevator installation construction technology
Foundation form and supportingconstruction technique of offshore wind farm
Qin Shunquan,Zhang Ruixia,Li Juntang
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 35-39
Keywords: offshore wind farm foundation form pile foundation jacket base suction barrel base set of caisson fan installation
Wu Zongzhi,Duo Yingquan,Wei Lijun,Guan Lei
Strategic Study of CAE 2006, Volume 8, Issue 4, Pages 46-49
Quantitative area risk assessment (QARA) method and its subsequent application in land safety planning for major hazard installations was initially studied in this paper. The basic principle and indicators of QARA were briefly introduced. Calculating models for individual and social risk, procedure for assessment as well as calculating software were developed. The developed method was applied to one oil and gas storage area. Individual risk contour and social risk F - N curve were established by the developed calculating software. The results show that the individual risk and social risk of the storage area are both beyond the allowed risk standards due to huge reserves of LPG and the high people density. The method shows theoretical and practical value in land use safety planning for major hazard installations and also for other kinds of disasters.
Keywords: risk assessment land use safety planning major hazard installation urban planning
Weiliang WANG, Junfu LYU, Zheng LI, Hai ZHANG, Guangxi YUE, Weidou NI
Frontiers in Energy 2019, Volume 13, Issue 4, Pages 798-807 doi: 10.1007/s11708-019-0633-z
Keywords: coal-fired power energy conservation net coal consumption rate new installation phasing out backward
Construction Technology of Shanghai Jinmao Building
Ye Keming,Fan Qingguo
Strategic Study of CAE 2000, Volume 2, Issue 10, Pages 42-49
Shanghai Jinmao building is the 3rd highest building in the world at present. The main building consists of reinforced concrete core wall and exterior structure steel frame. It is rather difficult to construct this edifice in such a poor soil condition in Shanghai. Proceeding from actual facts, Shanghai Construction Groups (SCG) makes efforts to conduct technology innovation, and absorbs advanced experiences domestic and abroad wildly. A unit of unique construction technique and a suitable managing system were developed with the growth of this building. SCG successfully solved a series of construction difficulties including deep-foundation work, mega-columns construction, high - altitude construction and erection, and so on. It only spent 4 years on this building, which set a high-speed record in construction history.
Keywords: Jinmao Building extra-deep slurry wall extra-high building big-size steel tube pile installation of steel
Title Author Date Type Operation
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Journal Article
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Journal Article
Experimental and modeling studies on installation of arc sprayed Zn anodes for protection of reinforced
Xianming SHI
Journal Article
Energy and economic analysis of a point-focus concentrating photovoltaic system when its installation
C. RENNO, A. PERONE
Journal Article
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Journal Article
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Journal Article
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Journal Article
High precision installation technology of metal structure embedded parts of Three Gorges Project ship
Wei Shuman,Zhang Weiming and Li Chenzhi
Journal Article
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Journal Article
Research on the special lifting device for steel box girders of Sutong Bridge
Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa
Journal Article
Construction technology of well shaft tower construction engineering
Yang Yiming,Huang Jiapin,Shen Xihua,Cao Yueqin and Ma Zhimin
Journal Article
Foundation form and supportingconstruction technique of offshore wind farm
Qin Shunquan,Zhang Ruixia,Li Juntang
Journal Article
Quantitative Area Risk Assessment Method and its Application in Land Use Safety Planning for Major Hazard Installations
Wu Zongzhi,Duo Yingquan,Wei Lijun,Guan Lei
Journal Article
Energy conservation in China’s coal-fired power industry by installing advanced units and organized phasing out backward production
Weiliang WANG, Junfu LYU, Zheng LI, Hai ZHANG, Guangxi YUE, Weidou NI
Journal Article